Commercial EV charger installation in Ottawa

EV charging station installation for workplace and fleet charging, and for multi-unit residential buildings. Level 2 is 208 or 240 volts, and Level 3 direct-current charging takes a 480 volt supply.

  • Master Electrician
  • ESA compliant
  • Licensed and insured
  • BBB Accredited, A+ rated

Overview

Charging the site can carry

Several chargers are not one home charger repeated. With no energy management system, each charger is added at 100 percent of its rating, including in an apartment building under Rules 8-202 to 8-210. With a system that monitors the service and controls the chargers, the calculation uses the maximum that system allows. For a single home, see EV charger installation in Orleans and Ottawa. Send a request with the number of stalls and the service size.

Vincent Bourdeau standing beside his work van on a residential street
Vincent Bourdeau with the work van

What is included

What a site installation covers

  1. 01

    Level 2 or Level 3

    Level 2 charging is 208 or 240 volts AC, the supply used at businesses and public spaces. Level 3 is direct current. It is listed with a 480 volt input and a DC outlet that is not found in homes, and it is the charger used at dedicated stations and along highway corridors.

  2. 02

    Several chargers

    With no energy management system, each charger is entered at 100 percent of its rating. That demand applies to apartment buildings, schools, hospitals, hotels, motels and dormitories. The total is the sum of those ratings.

  3. 03

    Energy management

    An energy management system monitors loads and controls the chargers. The demand is limited to the maximum the system allows. Where it monitors the service and the feeders, that demand is not added again on top of the calculated load. Each charger still needs its own branch circuit, unless the system is what lets them share one.

  4. 04

    ESA filing

    The Licensed Electrical Contractor files the notification with the Electrical Safety Authority before the work starts. A new charger circuit is not a like-for-like replacement.

Before you book

Good to know

Who it is for
Property managers, condo boards and business owners. Tell us who is approving the work on the form.
Charger
The charger hardware is supplied by the client, or sourced on request. Tell us which on the form.
Utility upgrade
Coordination of a utility service upgrade is quoted separately from the charger circuits.

Questions

Commercial EV charger installation questions

What is the difference between Level 2 and Level 3 charging?

Level 2 is 208 or 240 volts AC, and it is the supply used at businesses and public spaces as well as homes. Level 3 is direct current. It is listed with a 480 volt input and a DC outlet that is not found in homes, and it is used at dedicated stations and along highway corridors.

How is the load calculated for several chargers?

With no energy management system, each charger is added at 100 percent of its rating. That applies to apartment buildings, schools, hospitals, hotels, motels and dormitories. The total is the sum of the ratings. With a system that monitors the service and controls the chargers, the calculation uses the maximum that system allows, not the sum of every nameplate.

What is an EV energy management system?

It monitors electrical loads and controls the chargers by connecting, disconnecting, increasing or reducing power. When the chargers are controlled that way, their demand is limited to the maximum the system allows. Where the system monitors the service and the feeders, that demand is not added again on top of the calculated load. A charger is still on its own branch circuit, unless the system is what lets it share a circuit.

Do you file commercial charger work with the ESA?

Yes. The Licensed Electrical Contractor files the notification with the Electrical Safety Authority before the work starts. A new charger circuit is not a like-for-like replacement.

Who supplies the chargers?

The charger hardware is supplied by the client, or sourced on request. Tell us which on the form. The circuits are sized to the chargers you name.

Do you work with property managers and condo boards?

Yes. The work is for property managers, condo boards and business owners, including workplace and fleet charging and multi-unit residential buildings. Tell us who is approving the work on the form.

How it works

From the service size to the stalls

  1. 01

    Request

    Tell us the number of stalls, the service size and who supplies the chargers.

  2. 02

    Load calculation

    We add each charger at 100 percent, or at the maximum an energy management system allows, and quote the work.

  3. 03

    Installation

    We run the circuits and mount and connect the chargers.

  4. 04

    ESA

    The notification is filed with the Electrical Safety Authority before the work starts.

Request a quote

Plan the charging for the site

Tell us the number of stalls, the service size and who supplies the chargers.